HDB · BTO · resale

HDB renovation by a listed contractor, not an ID firm.

HDB requires renovation works to go through a contractor in its Directory of Renovation Contractors. TEO is listed. We submit the permit, keep noisy works inside HDB hours, and carry hacking through painting under one quote.

HDB DRCListed contractor — number on your quote
PermitWe file works that need HDB approval
9–5Noisy works on weekdays only
20%Deposit cap on signed scope
Permits

What needs an HDB permit — and what does not

You are still responsible for the works in your flat. We tell you before we start whether the scope needs a permit, and we submit it as the listed contractor.

Usually needs a permit Hacking & wet works

Wall hacking, floor hacking, bathroom layout changes, and other works that affect structure or waterproofing. Allow up to three working weeks for approval. For BTO, the permit is typically valid three months from approval.

Often no permit Painting & overlays

Painting, most vinyl overlays, and carpentry-free cosmetic work usually do not need a permit. We still confirm against current HDB guidelines for your block.

BTO years 1–3 Bathroom floors

HDB’s waterproofing warranty generally means you cannot retile bathroom floors in the first three years. We overlay or leave as-is unless you are outside that window.

Always verify the latest rules on hdb.gov.sg. Noisy renovation works in HDB flats are typically 9am–5pm on weekdays, excluding public holidays.

Hacking, dismantling and debris disposal in an HDB flat
Tiling, screeding and waterproofing in an HDB bathroom
Painting, vinyl flooring, partitions and false ceiling
Plumbing, sanitary ware and licensed electrical wiring
Written itemised quote and workmanship warranty discussion

Hacking, dismantling and debris disposal

Scope

Trades we run in an HDB flat

We do not sell 3D design packages or in-house carpentry showrooms. If you already have drawings, we price the build. If you only need trades, that is the job.

HDB FAQ

Before you pay a deposit

How do I check you are in HDB’s directory?

Ask for the HDB licence number on the quotation and search HDB’s Directory of Renovation Contractors. The company name on the quote must match the listing. We print UEN 202317798R on the same page.

How long does a 4-room HDB job take?

A trades-only partial job can be days to a few weeks. A fuller hacking-and-finishing job is often 4–8 weeks depending on permit approval and noisy-works hours. You get a written schedule before we start.

Do I need an interior designer?

Only if you want design and custom carpentry. Going direct to a listed contractor is usually cheaper when the layout is already decided. We will not pretend to be an ID firm.

Free HDB site visit

Send flat type (3 / 4 / 5-room), town, key collection or start date, and photos. We confirm what needs a permit before you sign.

WhatsApp will open so you can attach photos of the flat.

WhatsApp TEO